Hotel Miura Čeladná interior part I

Hotel Miura Čeladná interior part I

The most modern architectural elements of minimalism and functionalism characterize the luxury hotel Miura, which was built in 2011 on the outskirts of the Beskydy village of Čeladná. It is primarily intended for visitors to the local golf resort.

As part of this project, we supplied and installed plasterboard bathroom structures in 42 rooms. We then installed aluminium painted tiles and Eclisse sliding glass doors on these structures. For the toilets in the hotel corridors, the Dorma Manet glass sliding door system was used. We also contributed to the finishing of the wellness area and the central restaurant. Fixed glass screens in the showers, Clear Economy Line sliding glass doors in the sauna and Dorma Universal glass doors in the entrance to the relaxation area with swimming pool were supplied and installed. In the restaurant, we installed a Dorma Magneo electromagnetic door operator and a Wicona aluminium folding wall to separate the indoor area from the terrace. To protect the large-format paintings on the reception and restaurant walls, we created pre-set glass panes in extra clear Diamant glass, anchored by atypical stainless steel point handles.

© 2024 Clearmont - All Rights Reserved